“Analysis Of Box And Bored Pile Segment Planning In Tunnel Using Jacking Box Tunnel Method” (2025) Jurnal Ilmiah Dinamika Rekayasa, 21(1). doi:10.20884/1.dinarek.2025.21.1.119.