“Analysis of Box and Bored Pile Segment Planning In Tunnel Using Jacking Box Tunnel Method”. 2025. Jurnal Ilmiah Dinamika Rekayasa 21 (1). https://doi.org/10.20884/1.dinarek.2024.20.1.85.